Parallel London EventVillage


Client Brief:

Parallel London (c/o Innovision) launched the world’s first fully inclusive push/ run event at the Queen Elizabeth Olympic Park in September 2016. The event featured a family festival, and Baconinflate was commisionned to provide temporary structures for sponsor, Barclays, in the ‘technology zone’ and Race Arches for the start and finish lines.

What we delivered:

Our 8m EventStation HPs were used for Barclays, incorporating branded banners, flooring, base plate system, metal trussing and LED lighting. This created a space for people to wander through the displays in the tech zone, whilst providing protection from the elements for the equipment. The race arches were made with interchangable banners to display the sponsor logos. The event was a huge success, with plans to make this a yearly occasion after seeing thousands of people enjoying the celebration of inclusivity.

View More Structures

A data sheet for this product is available in PDF
format, please enter your details to download





Case study date: 18/10/2016
Author: Baconinflate
Page address: https://baconinflate.co.uk/case-studies/parallel-london-eventvillage/

Stay engaged


We highly value your privacy and promise to send bespoke hand-crafted monthly updates.