KIA Motors 12m AirDesic


Client Brief:

To provide the venue for a dealer network training activity for Kia Motors (c/o Fusion), provided by Motiv8 Training, taking place over four days on a large skid pan at Milbrook Proving Ground.

What we delivered:

Our 12m AirDesic was hire for the duration of the event. The structure featured a clear canopy and white inflatable framework which lent to the clinical, scientific environment created. The high pressure structure was branded using digitally printed internal and external branding boards, along with a flooring system, LED lighting and a base plate system.

Photography by Caitlin Mogridge http://www.caitlinmogridge.co.uk/

View More Structures
Case study date: 24/03/2016
Author: Baconinflate
Page address: https://baconinflate.co.uk/case-studies/kia-motors-12m-airdesic/